Berkey Gay Building
A previous furniture factory that was originally built in the 1800s has now become home to over 250 apartments, office space, and a restaurant. This project required five (5) Energy Recovery Units (ERV's), controls for loop boilers, cooling tower and plate heat exchanger, venting, over four-hundred (400) heat pumps, exhaust for the waste room, make-up air system for the laundry room, various electric heaters, underground ductwork, and thousands of feet of spiral ductwork.