Gezon Medical
This state-of-the-art facility required one fluid cooler, boiler, water source heat pump loop piping, Energy Recovery Unit (ERV), snowmelt system, and gas piping.
This state-of-the-art facility required one fluid cooler, boiler, water source heat pump loop piping, Energy Recovery Unit (ERV), snowmelt system, and gas piping.